| Print | Print (incl. sub-chapters) |
5.9. HEATER CONNECTION |
|
Check to see that all holes in the bulkhead and related to this bracket are properly sized and aligned, using the bracket as a template.
Fit the bracket to the bulkhead on the engine side using two M6x20 bolts on the right hand side. The lower left is fitted with the bolt that also fits the pedal assembly and the upper left (next to the master brake cylinder) is fitted using the accelerator cable guide. The bolt, which goes through the middle, is also used to fit the gearshift mechanism and will be fitted at a later stage.
Equip both sides of the fasteners with a M6 mudguard washer and use M6 lock nuts. The accelerator cable will be fitted later.
The elongated vertical slot will be used for the parking brake mechanism. |
RELATED PARTS
>>Scuttle set
>>Heather connector (INOX)
|